Server-First Media Deadline Audit — 2026-08-29

Audit scope: IC-YT-CARTOON-001 and IC-ARCHITECT-2030-FILM-001.

IC-YT-CARTOON-001

  • Project DB state: IN_PRODUCTION.
  • Format boundary: MOTION_CARTOON_ANIMATIC != FULL_FRAME_ANIMATION.
  • 15 agent assignments exist; all 15 remain ASSIGNED, 0 DONE, no per-agent output_ref.
  • Canonical MASTER-PRODUCTION.md exists with character/world bible, 30-minute story structure and 15-agent role map.
  • Visual evidence: one referenced Runway task 81125577-17e0-4439-ae18-342b1f681f98 marked SUCCEEDED in the production note; no visual binary is persisted in this Val blob store.
  • Script: D01 IN_PROGRESS; no final script evidence_ref.
  • Storyboard: D03 IN_PROGRESS; no final storyboard evidence_ref.
  • Voiceover: D04 PENDING.
  • Audio mix: D05 PENDING.
  • Final MP4: D06 PENDING; no evidence_ref; exact media duration NOT VERIFIED.
  • YouTube package: D07 IN_PROGRESS.
  • YouTube channel: D08 BLOCKED. No connected YouTube write/channel-creation plugin was found at audit time. No creation/upload/publication claim permitted.
  • Server persistence: project metadata and master production note persist in Val Town DB/files; final media does not. Val project blob store contains 0 blobs.

IC-ARCHITECT-2030-FILM-001

  • Project DB state: IN_PRODUCTION.
  • Truth boundary enforced: FICTIONAL_FUTURE_VISION_2030 != DOCUMENTARY_FACT; MOTION_FILM_ANIMATIC != FULL_FRAME_CINEMA.
  • Likeness boundary: no precise likeness without authorized image reference; silhouette/back-view/hands/distant framing permitted. No voice cloning without authorized voice sample.
  • 15 agent assignments exist; all 15 remain ASSIGNED, 0 DONE, no per-agent output_ref.
  • PROJECT-BIBLE.md exists with 30-minute act map and explicit fictional-future truth boundary.
  • ORION media consensus exists: cycle orion-media-architect-2030-001, FILM_PRODUCTION, critic PASS, verifier PASS, authority ADVISORY_ONLY. Evidence digest remains sha256:pending-media-cycle, so this is coordination evidence, not finished-film evidence.
  • Screenplay A02 IN_PROGRESS; no evidence_ref.
  • Scene timeline A03 IN_PROGRESS; act-level timing exists, scene-level shot timing incomplete.
  • Visual concept art A04 IN_PROGRESS; no evidence_ref persisted.
  • Narration A05 PENDING.
  • Music/sound A06 PENDING.
  • Final film A07 PENDING; no evidence_ref; exact media duration NOT VERIFIED.
  • Truth/QA A08 PENDING.
  • Server persistence: project metadata and production bible persist in Val Town DB/files; final media does not. Val project blob store contains 0 blobs.

Deadline verdict

Neither project has a finished MP4 with export evidence, exact verified duration, completed QA, and persistent final-media storage. Do not label either project complete. The technically declared target format is motion-cartoon/animatic for IC-YT-CARTOON-001 and cinematic future-vision motion film / animatic for IC-ARCHITECT-2030-FILM-001.